[ Result ]
increased system reliability, improved maintainability, reduced downtime, and increased overall equipment performance
[ Equipment inspection ]
analysis of the current condition and preparation of a report on the feasibility of component replacement;
[ Control system selection ]
selection of modern PLC systems with possible replacement for Siemens, B&R, Omron, OWEN, and other solutions according to customer requirements;
[ Software development ]
preservation of existing functionality with the possibility of expansion and addition of new features;
[ Installation and dismantling ]
removal of the outdated system and installation of new components into existing control cabinets;
[ Commissioning and startup ]
bringing the equipment into operating mode and achieving design performance parameters;